Meyer Burger再获亚洲客户订单

发布于 2017年1月24日
Meyer Burger 
Meyer Burger Technology Ltd today announced that it concluded further important contracts amounting to a combined contract volume of about CHF 19 million with three different customers in Asia. 

The equipment ordered includes the delivery, installation and commissioning of the MAiA 2.1 system platform with the mass production scalable MB PERC technology, SiNA cell coating equipment for the manufacture of high quality solar cells and DW 288 Series 3 diamond wire cutting technology for the production of solar wafers for high performance cells. All three customers rely on Meyer Burger's innovative equipment to increase the efficiency and quality of their existing production lines. The delivery and commissioning of the equipment is scheduled to start in the second quarter 2017.


以上新闻中相关公司单个页面

Meyer Burger (光伏组件): https://www.enf.com.cn/meyer-burger
光伏新闻是免费发布的,请发送您的新闻到